I-86 bridge repair scheduled in Corning

Local News

CORNING, N.Y. (WETM) – Bridge repair work will begin on Interstate 86 over Post Creek, in both the eastbound and westbound directions, on July 22, 2019, according to NYSDOT.

The bridge is located approximately one-half mile east of State Route 414 in the City of Corning, Steuben County. 

Work will consist of structural lifting and bearing replacement, concrete abutment repair and minor drainage work.

For most of the work, two lanes of traffic will be maintained.  Occasional daytime lane closures may be needed during structural lifting and material delivery. 

Work is anticipated to last approximately two months, weather permitting.

For real-time travel information, call 511 or visit www.511NY.org.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.